Field Trials, Lab Reports, and Independent Reports and Documents
Click a subject heading below to expand and see the full list of test reports in that category.
REPLACE LIME
- Anderson- How Roadbond EN 1 Works-Engineer Version
- Dallas – Henley Johnston Harlondale Report
- Dallas – Henley Johnston Sundail Alley w photos
- Engineer’s comments – In-place CBR 12 years after construction
- EST – UCS Report 7 & 17 day
- In-place CBR 12 years after construction
- In-place CBR – TXDOT FM 856 – 20 years after construction
- Kleinfelder-Sundance Lime RB Combo
- PSI – Swell Report .2%
- PSI – La Plaza Mall Swell Test
- PSI – Linear Shrinkage Report, 40 PI Clay
- PSI – Linear Shrinkage Report, Lab
- TxDOT TTI – Report 3929-1 overview
- TxDOT TTI – Executive Summary Review of Report 3929-1
- TxDOT TTI – Report 3929-1, complete report
REDUCE PORTLAND CEMENT & FLYASH
- Alvin – Report w Portland Cement
- Andrews – Singapore Field Trials
- Australia – Initial Lab Report Summary
- Engineers report – In-place CBR 18 – 20 years after construction
- Ft Worth – Block Crack Study w wo RB
- Henley Enterprises – Waco project, Portland cement w wo RB
- In-place CBR 12 years after construction
- In-place CBR 18 – 20 years after construction
- Klienfelder – Report RB w Lime or Cement
- Lake Dallas – Block Crack Study w wo RB
- Lewisville – Street reclaimation w wo RB
- PSI – Brownsville, Cement w wo RB, 7 & 28 days
- QC Lab – CBR Report 4% Lime w wo RB
- Ratio of Reflective Cracks, w wo RB
- Tindol Construction – Field report on strength of drilled cores stabilized w Roadbond EN 1 & Portland cement
- TxDOT – Childress Lab, Flyash Low PI soil
- TXDOT – Childress Lab, Flyash w wo RB
- TXDOT – US83, Flyash w wo RB
IMPROVES STRENGTH OF ROADBASE & IN-PLACE MATERIAL
- Australia – Andrews Singapore Report
- Australia – Copley Report unsealed roads
- Australia – Eyre Highway Report
- Australia – Initial Lab Report
- Baker Shiflett – CBR
- Cameron Co – Structural values street sections
- Ft. Worth – Shelman Trail Coring Report
- In-place CBR – TXDOT FM 856 – 20 years after construction
- PSI – CBR Houston Ofc
- TXDOT – Abilene District Lab Report
- TXDOT – Childress Lab RB v raw Base
- TxDOT – Rap w base Classification Chart w RB
- TXDOT – US290 FWD, Liedy Report
- TxDOT- Tyler District Lab Report
- US Forest Service – F-5 Report 101 pages
- US Forest Service – F-5 Study Forest Service summary
GREEN DOCUMENTS
- Talem Report – TCLP Extraction Drill Cuttings
- Talem Report – TCLP Extraction RCRA Metals
- Penn Conservation Commission – Approval letter
- Trout Toxicity Performance Report Nov 3 2010
- Trout Toxicity summary – EnviroScience Lab
- Trout Toxicity summary – GemChem Inc.
- Trout Toxixity summary – Talem Environmental, Inc.
- F-5 Study, US Forest Service
- Talem, Inc. Analytical Tests
- Green Criteria Elements of ROADBOND EN 1
- Gifford Engineering – Water Quality Report
- Talem, Inc. – Corrosivity Test
- Formation and Release of POPs in the Cement Industry
- Energy Consumption Benchmark Guide
- Applied Processes And Techniques In Lime Manufacturing
- Environmental, Health, and Safety Guidelines for Cement and Lime Manufacturing
- Lime Production
- Application for Green Certification
- LEED™ Benefits Summary
- LEED™ Credit Narrative